Head of Project Scheduling
LOCATION: West Henrietta / New York (US-NY), United States | BRAND: KB Signaling | REQUISITION ID: 7468 | JOB GRADE: 17 |
ON-SITE/REMOTE: Hybrid
KB Signaling delivers unparalleled end-to-end wayside and onboard conventional signaling Control, Command, and Signaling (CCS) platforms and solutions. A trailblazer, we are driven to provide the best solutions for improved safety, performance, and lower overall operating cost for today’s transit and freight railway systems and operators in North America and beyond. Our team is fueled by innovation and grounded in solid values, like giving back to the communities where we do business and embracing sustainability to help protect our planet. KB Signaling is part of a global, high-tech company that will challenge you and help you grow. Discover your potential.
JOB DESCRIPTION:
The Head of Project Scheduling role acts as the scheduling and planning subject matter expert in the projects organization. He or she will provide program/project planning and scheduling services during the development and execution phases of projects and programs, as well as guide the other schedulers in the organization in optimal use of scheduling tools and processes.
Essential Responsibilities
- Define and document key scheduling processes such as schedule methodologies and guidelines and implementation in Primavera P6
- During the early phases of the project/program, supports the Project Management team in developing the execution plan for the scope of work
- Is instrumental in defining and scheduling key contractual milestones for inclusion into contract documents
- Verifies the ability to execute the contractual scope of work by analyzing resources (human and quantity) requirements and ensures equipment, materials, and engineering services are capable of meeting the contractual schedule
- Supports the development of the work breakdown structure as required by the contract
- During the execution phase of the work, prepares and maintains several levels of increasing detail, time-phased Critical Path Method (CPM) schedules
- Resolves logic and schedule related conflicts through close interaction with participating functions/owners
- Obtains commitments to the plan from all associated stakeholders
- Provides status updates to schedules, verifies accuracy of work completed and analyzes progress, schedule performance and variances from the plan
- Obtains and/or recommends corrective actions for mitigating deviations from the plan
- Works closely with the entire Project Management Team, especially the Cost Control group to identify and resolve schedule deviations and trends
- Prepares and maintains schedule metrics
- Prepares the schedule analysis for inclusion into the monthly project progress report
Required Knowledge, Skills and Competencies:
- Requires strong planning, organizational, oral and written communication, and analytical and interpersonal skills
- Must also have strong personal computer skills and ability to read, interpret and understand technical drawings and documents
- A solid understanding of planning and scheduling concepts with hands on experience in the use of CPM scheduling software, in particular Primavera P6
- Candidate must be a high energy individual with some prior planning and scheduling experience in an engineering manufacturing environment
- Additional prior related experience in other project controls/management areas (cost engineering, logistics, contracts, etc.) is a plus
Required Qualifications:
- Bachelor’s degree from an accredited university or college
- Minimum of 5 years scheduling experience
- Minimum of 3 years Primavera P6 experience
Desired:
- Self-starter with high initiative
- Prior experience in engineering, procurement, and/or manufacturing preferred
- Additional prior related experience in another project management discipline (cost, planning, estimating) is desired
- Strong computer skills (Microsoft Word, PowerPoint, and Excel)
What does KB Signaling have to offer you?
- Competitive Health Benefits, including Medical, Prescription, Dental, Vision and Virtual visits
- Company-paid Basic Life and Accidental Death & Dismemberment Insurance
- Company-paid Short-Term Disability Coverage
- Voluntary life, Disability, and other Supplemental coverages
- Identity Theft and Legal Protection benefits
- Health and Dependent Care Flexible Spending Accounts
- Health Savings Accounts
- Generous 401(k) plan
- Personal Paid Time Off
- Company-paid holidays
KB Signaling Inc. is an Equal Employment Opportunity (EEO) employer. It is the policy of the Company to provide equal employment opportunities to all qualified applicants without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, age, protected veteran or disabled status, or genetic information.
Nearest Major Market: Rochester